Small changes were made in the add/modify activity
dialog. Small changes were made in the Settings
menu. Timetable HTML level was added, so you can
select a level from 0 to 5, each with additional
options. For instance, level 5 has highlighting of
similar fields when moving the mouse over text.
Additional tests were added to check for
impossible constraint min n days between
activities. The possibility to change all min n
days constraints' weight by a single command was
added.