Information regarding Project Releases and Project Resources. Note that the information here is a quote from Freecode.com page, and the downloads themselves may not be hosted on OSDN.
A constraint was added to specify the maximum days
per week for an interval for teachers and
students. This can be used, for example, to
specify that teachers and students must not work
more than 2 times per week in the last hours of
the day. A constraint was added to specify for a
group of activities that they should end the day
for students. When modifying a constraint's
(sub)activities preferred starting times or time
slots, the activity tag is now correctly updated.
A (probably very rare) crash bug has been fixed.
A routine to change multiple constraints at once has been added. The user can specify old values as a filter to all min n days between activities constraints, and the modified constraints will have the new values entered in the dialog. Constraints subactivities preferred time slots and subactivities preferred starting times have been added. You can specify the component number for subactivities, which is useful for constraining courses (e.g. only the first or the last components of a split activity to be placed earlier). This release uses Qt 4.4.0 and gcc 4.3.1.
A routine to change multiple constraints at once has been added. The user can specify old values as a filter to all min n days between activities constraints, and the modified constraints will have the new values entered in the dialog.
Preferred STARTING times for constraint
activity(ies) were added. The old preferred time
constraints have been renamed to preferred time
slots and are more correct now, taking into
consideration the duration of each activity. FET
now allows more constraint activity preferred
starting times (or preferred time slots) for the
same activity ID, which was restricted by a bug to
only one. You can add more constraints with
different weights.