Ticket #44504

Link with road no longer work. It ceases at each step

Open Date: 2022-05-03 21:21 Last Update: 2022-05-06 09:30

Reporter:
Owner:
Type:
Status:
Closed
Component:
MileStone:
Priority:
5 - Medium
Severity:
6
Resolution:
Fixed
File:
2

Details

With on worker, SHIFT-R (or CTRL-R i don't remember) allows to draw a path, which should be paved with road.

But, after doing the first tile, i got a message like 'activity is not available' , so the jobs stops, instead of moving the worker to next tile and continue

Ticket History (3/8 Histories)

2022-05-03 21:21 Updated by: alain_bkr
  • New Ticket "Link with road no longer work. It ceases at each step" created
2022-05-03 21:44 Updated by: cazfi
Comment

Likely a regression caused by #44370. At least the failure is within the very code it rearranged.

2022-05-03 22:04 Updated by: cazfi
Comment

Reply To cazfi

Likely a regression caused by #44370. At least the failure is within the very code it rearranged.

The activity was erroneously considered illegal already before #44370, but it made such activities considered illegal to also drop orders.

2022-05-03 22:30 Updated by: cazfi
  • Owner Update from (None) to cazfi
  • Resolution Update from None to Accepted
  • Component Update from (None) to Server
2022-05-04 07:07 Updated by: alain_bkr
Comment

thanks , it fixed the problem on 3.0.1

2022-05-06 09:30 Updated by: cazfi
  • Status Update from Open to Closed
  • Resolution Update from Accepted to Fixed

Edit

Please login to add comment to this ticket » Login